Orrik Smelt opens arrival tickets from both scales and the shared freight agreement at the twin scales at Three Kilns Gate. Before anyone changes a mark, the crew checks one gate resets its scale after the night cooling period. The cooling weeks period sets the pace of the work.
The page holds 93 loads with the same tare value at both gates. Orrik Smelt reads the preceding count, 94, before the next line is entered. A number without a date would not tell the next crew what changed.
Each town says its scale passed inspection. Carriers want the reset time printed beside the load ticket. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.
Workers and neighbors submit accounts before the hearing closes. The Year first, cooling weeks window 2 file remains open for its scheduled decision. Both gates will add the reset time to the next shared manifest.
The shift closes with the source page attached to the board. The next file uses a new date and scope.