The first file on the cinder road bridge began with load cards, repair invoices and the closure board. The city then checked the source, heard affected residents and sent a second office to repeat the count.
The current Year second, rain shift window 3 file records 75 heavy crossings during the repair limit; the previous window records 75. The longer sequence makes the change visible, while each count remains tied to its own dates.
A turning point was the observation that the lower support is reinforced while one lane remains open. It narrowed the discussion from a general claim to a question about how the rule works at the site.
Carriers favor a supervised crossing. Masons say the second lane changes vibration on the support. The shared record is larger than it was at the start, although the parties still assign it different weight.
The clerk closes this docket and assigns the next window a fresh scope. The board closed this docket after it approved a narrow exception with a public inspection card. The next window starts with a fresh record.