The first file on the cooling water allocation began with cooling meter cards and the neighborhood draw schedule. The city then checked the source, heard affected residents and sent a second office to repeat the count.

The current Year fifth, rain shift window 2 file records 90 draws with both a meter mark and a discharge note; the previous window records 87. The longer sequence makes the change visible, while each count remains tied to its own dates.

A turning point was the observation that the discharge channel warms after a long furnace run. It narrowed the discussion from a general claim to a question about how the rule works at the site.

Foundry managers count intake volume. Downstream residents want the discharge temperature recorded too. The shared record is larger than it was at the start, although the parties still assign it different weight.

Asecond office compares the count with the posted operating state. The Year fifth, rain shift window 2 file remains open for its scheduled decision. The water office will add a downstream reading to each intake card.