Vek Cinder opens gear issue slips, repair tags and the temperature log at the fitting room at Red Coil Foundry. Before anyone changes a mark, the crew checks one mask size is listed as a general fit for three kinds of task. The smelt run period sets the pace of the work.
The page holds 99 issued masks with a fit check recorded for the current task. Vek Cinder reads the preceding count, 99, before the next line is entered. A number without a date would not tell the next crew what changed.
The storekeeper needs a compact inventory. Workers ask that fit be checked by task rather than by stock size alone. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.
Anew work docket opens with a named machine, shift and measure. The Year fifth, smelt run window 2 file remains open for its scheduled decision. The fitting room will record the task beside each fit check.
The shift closes with the source page attached to the board. The next file uses a new date and scope.