The Year third, smelt run window 2 review of the shift change handoff reached a new step at the furnace board at Blackslag Row. Asecond office compares the count with the posted operating state. The Year third, smelt run window 2 file remains open for its scheduled decision. The board will test a two-signature handoff with a separate condition line.
Nazza Wire, ward and shift correspondent, said the latest file records 89 handoffs with a signed condition note before the next bell. The preceding window recorded 92; the figures cover entries on the register, not every condition at the site.
Supervisors count a completed handoff when the board is signed. Workers want the condition note to travel with it. At the latest public meeting, residents asked the clerk to keep their account beside the source count.
The the assignment board and the outgoing crew’s condition notes lists 89 handoffs with a signed condition note before the next bell; the previous window lists 92. Grikka Ash checked both against crew logs compared with the inspection card for the same shift. The next measurement is assigned to a second office and will be published with its method.
The Year third, smelt run window 2 file remains open for its scheduled decision. The board will test a two-signature handoff with a separate condition line.