The Year fourth, smelt run window 3 review of the shift change handoff reached a new step at the furnace board at Blackslag Row. Asecond office compares the count with the posted operating state. The Year fourth, smelt run window 3 file remains open for its scheduled decision. The board will test a two-signature handoff with a separate condition line.

Nazza Wire, ward and shift correspondent, said the latest file records 84 handoffs with a signed condition note before the next bell. The preceding window recorded 87; the figures cover entries on the register, not every condition at the site.

Supervisors count a completed handoff when the board is signed. Workers want the condition note to travel with it. At the latest public meeting, residents asked the clerk to keep their account beside the source count.

The the assignment board and the outgoing crew’s condition notes lists 84 handoffs with a signed condition note before the next bell; the previous window lists 87. Vek Cinder checked both against meter readings checked against a dated shift and operating condition. The next measurement is assigned to a second office and will be published with its method.

The Year fourth, smelt run window 3 file remains open for its scheduled decision. The board will test a two-signature handoff with a separate condition line.