Vela Orr opens air sample locations, vent fan hours and ward complaint cards at the westward vent corridor. Before anyone changes a mark, the crew checks one sample point sits below the fan outlet while the public board uses the upper reading. The cooling weeks period sets the pace of the work.
The page holds 88 samples with a location and a fan setting attached. Vela Orr reads the preceding count, 92, before the next line is entered. A number without a date would not tell the next crew what changed.
The operator relies on the upper monitor. Residents ask for a sample from the corridor where they work and sleep. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.
The board publishes options with paid time, water use or cost shown separately. The Year second, cooling weeks window 2 file remains open for its scheduled decision. The ward monitor will publish paired samples with fan hours on the same card.
The shift closes with the source page attached to the board. The next file uses a new date and scope.