A review of repair tickets, check-out marks and the shop credit ledger finds a gap between the total in the public summary and the conditions recorded at the common tool bench at Ash Yard. The difference does not prove that anyone misstated the file. It shows what the public count leaves out: several crews share one grinding wheel during the same hour.

The repair tickets, check-out marks and the shop credit ledger lists 79 tools returned with a completed repair ticket; the previous window lists 84. Grikka Ash checked both against crew logs compared with the inspection card for the same shift. The source was checked against a second copy held by Orrik Smelt. No dated correction to either copy was present when the comparison closed.

The steward assigns the whole cost to the last borrower. Crews say the check-out slate should show a shared handoff. The office has not supplied a separate measure that would settle the disagreement, so the two explanations remain competing accounts.

This report supports a narrower finding: the count is repeatable, but it is not enough to decide how to assign repair time when a shared tool is worn by several crews.

The board publishes options with paid time, water use or cost shown separately. The Year second, rain shift window 2 file remains open for its scheduled decision. The bench will trial a two-crew handoff mark beside the repair ticket.